LK Automation Limited LK Automation Limited
Brand Sort: OMRON | MITSUBISHI | Proface | Mennekes | Yaskawa
Home >> Price
A9GT-J71E71-T
MITSUBISHI A9GT-J71E71-T
Cable length: 30m.
For long distance connections between QCPU and GOT (above 13.2M) (need A9GT-QCNB).
Long distance connection between two GOT.
Applicable models: GT16, GT15, GT11, GT27, GT25. Motor series: low inertia, medium power.
Rated output power: 15.0kw.
Rated speed: 2000r/min.
Whether to take the brake: No .
Shaft end: Standard (straight) A9GT-J71E71-T.
Voltage: 400V type.
Protection level: IP65 (IP67) A9GT-J71E71-T
Features: low inertia from low speed to high speed, three modes can be selected, suitable for different application range. As a standard port, 30KW or greater power is suitable for flange (type) installation and support foot mounting.
Application example: injection molding machine, semiconductor manufacturing equipment, large conveyor machinery A9GT-J71E71-T.
High resolution encoder 131072p/rev (17 bit).
The encoder with high resolution ensures excellent performance and stability at low speed.
All motor dimensions are the same as before and all are compatible with the wiring. Analog channel: 16 channels.
Input / output (resolution): 0 ~ 4000.
Conversion speed: 100ms/16 channel A9GT-J71E71-T.
Analog module installation .
Power supply: AC170V ~ 264V.
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system.
MITSUBISHI PLC detection, fault diagnosis and display and other procedures.
These procedures are relatively independent, generally in the basic completion of the program design and then add.
Hardware simulation method is to use a number of hardware equipment to simulate the generation of the signal,
The signals are connected to the input end of the PLC system in a haard wired way, and the timeliness is strong A9GT-J71E71-T.
Software simulation method is in the MITSUBISHI PLC in the preparation of a set of simulation program,
The simulation provides the field signal, which is simple and easy to operate, but it is not easy too gguarantee the timeliness A9GT-J71E71-T.
Simulation of the process of debugging, debugging method can be used to segment, and the monitoring function of programmer.
A9GT-J71E71-T Operation manual/Instructions/Model selection sample download link: /searchDownload.html?Search=A9GT-J71E71-T&select=5


...more relevant model market price >>>>
Related products