LK Automation Limited LK Automation Limited
Information sort OMRON | MITSUBISHI | Proface | Mennekes | Yaskawa
Home >> Supply
AJ65BT-68TD MITSUBISHI AJ65BT-68TD


Input type: DC input, positive common end.
Input points: 8 points.
Enter the response time: 0.2ms below, below 1.5ms, 5ms below, 10ms the following.
Rated input voltage / current: DC12V/11mA.
Output form: transistor output, leakage type.
Output points: 8 points.
OFF leakage current: 0 AJ65BT-68TD.1mA.
Output protection function: No.
Ratted load voltage / current: DC12V/0.5A.
External connection: 3 line /2 line type.
According to the external connection mode and the external equipment input and output specifications,
Choose from a rich product lineup AJ65BT-68TD.
Finger protection through the upper part of the terminal,
The human body will not be exposed to live parts,
Therefore, the terminal station type remote I/O module can be directly mounted to the machine tool AJ65BT-68TD. DC input points: 8 points.
Input voltage and current: 7mA, DC24V.
Response time: 10ms.
8 point /1 a public side.
Positive / negative sharing.
Output points: 8 points.
Output voltage and current: DC24V, 0.3A/1 point, 2.4A/1 common end.
Response time: 2ms.
8 point /1 a public side MITSUBISHI AJ65BT-68TD.
Output form: transistor output, leakage type.
34 point terminal station.
Number of stations: 2 stops.
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system MITSUBISHI AJ65BT-68TD.
MITSUBISHI PLC detection, fault diagnosis and display and other procedures.
These procedures are relatively independent, generally in the basic completion of the program design and then add MITSUBISHI AJ65BT-68TD.
Hardware simulation method is to use a number of hardware equipment to simulate the generation of the signal,
The signals are connected to the input end of the PLC system in a hard wired way, and the timeliness is strong.
Software simulation method is in the MITSUBISHI PLC in the preparation of a set of simulation program,
The simulation provides the field signal, which is simple and easy to operate, but it is not easy to guarantee the timeliness.
Simulation of the process of debugging, debugging method can be used to segment, and the monitoring function of programmer.
Screw, 2 piece type terminal
Thermocouple Input module.
Number of channels: 8 channels.
Number of stations: 4 stops.
Station type: remote equipment station.
MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulation debugging to further carry on the on-line unification to adjust.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on step by step.
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction.
Design control cabinet and the operating table and other parts of the electrical wiring diagram and wiring diagram.
Electrical interconnection diagram of each part of the design system.
According to the constructioon drawings of the site wiring, and carry out a detailed inspection AJ65BT-68TD.
Because the program design and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced.

Related supply information