AJ65BT-64DAI MITSUBISHI AJ65BT-64DAI Analog output module


Twisted pair cable.
Single bus.
MELSECNET/B (remote I/O station).
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually iimprove the functions specified by the system AJ65BT-64DAI.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system AJ65BT-64DAI.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc AJ65BT-64DAI.. JEMANET (OPCN-1) interface unit from the station.
The response time of PLC is the interval between the time of the change of the external output signal of the PLC and the time of the change of the external output signal which is controlled by it,
Lag time, this is the time constant of the input circuit,
The time constant of the output circuit, the arrangement of the user statement and the use of the instruction,
The cycle scan mode of PLC and the way of PLC to refresh the I/O and so on MITSUBISHI AJ65BT-64DAI.
This phenomenon is called the I/O delay time effect MITSUBISHI AJ65BT-64DAI.
Input status and input information input from the input interface,
CPU will be stored in the working data memory or in the input image register.
And then combine the data and the program with CPU.
The result is stored in the output image register or the working data memory,
And then output to the output interface, control the external drive MITSUBISHI AJ65BT-64DAI.
Screw, 2 piece type terminal.
Current output module.
Number of channels: 4 channels.
Number of stations: 2 stops.
Station type: remote equipment station.
High speed data transfer of up to 10Mbps;
The development of CC-LINK is not only to meet the control of high speed remote I/O,
But also to meet the high speed of the field of information control.
In order to achieve this goal, the transmission speed of CC-LINK is compared with that of the previous live network system to add 40 to 100Mbps AJ65BT-64DAI.
Such a high speed can not affect the speed of the machine control while allowing a large number of data communication. Cable length: 35 meters.