LK Automation Limited LK Automation Limited
Brand: OMRON | MITSUBISHI | Proface | Mennekes | Yaskawa
Go Back >> Product Catalogues
CL2Y8-TP1C2V MITSUBISHI Sensor connection type output module
Brand: MITSUBISHI
Name: Sensor connection type output module
Model: CL2Y8-TP1C2V
Output type: transistor output, drain type.
Output points: 8 points.
OFF leakage current: 0.1mA.
Output protection function.
Rated load voltage / current: DC24V/0.1A.
External connection: 2 wire.
Sensor connection type.
Minimum size of industry.
When installing the module can choose to use the DIN guide rail or screw mounting.
3 wire sensor input.

Input type: DC input, positive public end / negative public end.
Input points: 16 points.
Enter the response time: 0.2ms below, below 1.5ms, 5ms below, 10ms the following.
Rated input voltage / current: DC24V/7mA.
External connection: 3 wire.
According to the external connection mode and the external equipment input and output specifications,
Choose from a rich product lineup CL2Y8-TP1C2V MITSUBISHI CL2Y8-TP1C2V
Finger protection through the upper part of the terminal,
The human body will not be exposed to live parts,
Therefore, the terminal station type remote I/O module can be directly mounted to the machine tool. Output type: transistor output, source.
Output points: 16 points.
OFF leakage current: 0.1mA.
Output protection function CL2Y8-TP1C2V MITSUBISHI.
Rated load voltage / current: DC24V/DC24V/0.1A.
External connection: 3 wire.
Sensor connector type (E-CON type).
Using industry standard E-CON type.
Simple wiring through sensor connector.
When installing the module can choose to use the DIN guide rail or screw mounting.
3 wire sensor input. Screw terminal table type.
High precision / high resolution / high speed 2 piece type terminal CL2Y8-TP1C2V MITSUBISHI.
Voltage / current input module.
Number of channels: 4 channels.
Number of stations: 1 stops.
Station type: remote equipment station.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction.
Design control cabinet and the operating table and other parts of the electrical wiring diagram and wiring diagram.
Electrical interconnection diagram of each part of the design system.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program design and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced.
MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulation debugging to further carry on thhe on-line unification to adjust CL2Y8-TP1C2V.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on stepp by step CL2Y8-TP1C2V.
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be.


...More relevant models >>>>