LK Automation Limited LK Automation Limited
Brand: OMRON | MITSUBISHI | Proface | Mennekes | Yaskawa
Go Back >> Product Catalogues
AJ65DBTB1-32DT1 | MITSUBISHI DC input / transistor output module AJ65DBTB1-32DT1
Brand: MITSUBISHI
Name: DC input / transistor output module
Model: AJ65DBTB1-32DT1
Input type: DC input, positive public end / negative public end.
Input points: 16 points.
Enter the response time: 10ms the following.
Rated input voltage / current: DC24V/5mA.
Output form: transistor output, leakage type.
Output points: 16 points.
OFF leakage current: 0.1mA.
Output protection function: No.
Rated load voltage / current: DC24V/DC24V/0.5A.
External connection: 1 line /1 line type.
A2C shape terminal.
Type of input and output terminal.
Shape and A2C input and output modules are identical (same mounting dimensions),
Machining and installing holes are not required.

Input type: DC input, negative public end.
Input points: 8 points.
Enter the response time: 1.5ms the following.
Rated input voltage / current: DC24V/7mA.
Output form: transistor output, source.
Output points: 8 points.
OFF leakage current: 0.3mA.
Output protection function.
Rated load voltage / current: DC24V/1 MITSUBISHI AJ65DBTB1-32DT1. 0A.
External connection: /2 line 2~4 line type.
Waterproof connector type AJ65DBTB1-32DT1
Strong waterproof type of IP67 protection grade.
No need to stop the system can be replaced module.
Without the use of tools can be a simple connection, save time.
Terminal resistor built-in.
Can be installed along the 6 direction.
Hardware simulation method is to use a number of hardware equipment to simulate the generation of the signal,
The signals are connected to the input end of the PLC system in a hard wired way, and the timeliness is strong MITSUBISHI AJ65DBTB1-32DT1.
Software simulation method is in the MITSUBISHI PLC in the preparation of a set of simulation program,
The simulation provides the field signal, which is simple and easy to operate, but it is not easy to guarantee the timeliness.
Simulation of the process of debugging, debugging method can be used to segment, and the monitoring function of programmer MITSUBISHI AJ65DBTB1-32DT1. Input type: DC input, positive public end / negative public end.
Input points: 4 points.
Input response time: 0.5ms below /1 AJ65DBTB1-32DT1 MITSUBISHI. 5ms.
Rated input voltage / current: DC24V/4mA.
External connection: 2 wire.
Spring clip terminal.
Do not need to re tighten, suitable for wire specifications for 0 AJ65DBTB1-32DT1 MITSUBISHI. 3~1.5MM square.
Terminal block is 2 piece structure.
An input module shared by the common terminal of the positive and negative.
The 8 point of the output module is appended to the source type.
Can be installed along the 6 direction. A pack of 10.
Applicable models:
AJ65VBTCE - -8 - type AJ65DBTB1-32DT1 MITSUBISHI.
AJ65VBTCE - -16 - type. Number of channels: RS422, 1 channel
.
Configuration of master / local station,
In addition to the other site network with different CC-Link in addition to the main station and the remote station configuration can also be the main station and the local station configuration.
A local PLC can communicate with the master station PLC and other remote workstations.
MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulation debugging to further carry on the on-line unification to adjust.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on step by step.
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction.
Design control cabinet and the operating table and other parts of the electrical wiiring diagram and wiring diagram AJ65DBTB1-32DT1.
Electrical interconnection diagram of each part of the design system.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program deesign and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced MITSUBISHI AJ65DBTB1-32DT1.


...More relevant models >>>>