LK Automation Limited LK Automation Limited
Brand: OMRON | MITSUBISHI | Proface | Mennekes | Yaskawa
Go Back >> Product Catalogues
AJ35PTF-R2 | MITSUBISHI AJ35PTF-R2 Modular
Brand: MITSUBISHI
Name: Modular
Model: AJ35PTF-R2

Analog channel: 12 channels.
Input / output (resolution): 0 ~ 4000.
Conversion speed: 100ms/12 channel.
Analog module installation.
Power supply: AC170V ~ 264V.
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system MITSUBISHI AJ35PTF-R2 AJ35PTF-R2
MITSUBISHI PLC detection, fault diagnosis and display and other procedures.
These procedures are relatively independent, generally in the basic completion of the program design and then add.
Hardware simulation method is to use a number of hardware equipment to simulate the generation of the signal,
The signals are connected to the input end of the PLC system in a hard wired way, and the timeliness is strong MITSUBISHI AJ35PTF-R2.
Software simulation method is in the MITSUBISHI PLC in the preparation of a set of simulation program,
The simulation provides the field signal, which is simple and easy to operate, but it is not easy to guarantee the timeliness MITSUBISHI AJ35PTF-R2.
Simulation of the process of debugging, debugging method can be used to segment, and the monitoring function of programmer. DC input points: 4 points.
Input voltage and current: 7mA, DC24V AJ35PTF-R2 MITSUBISHI.
Response time: 10ms.
4 point /1 a public side.
Positive / negative sharing.
16 point terminal station.
MITSUBISHI PLC protection and chain procedures AJ35PTF-R2 MITSUBISHI.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system AJ35PTF-R2 MITSUBISHI.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..
MITSUBISHI PLC program simullation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of thee program MITSUBISHI AJ35PTF-R2 AJ35PTF-R2.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.


...More relevant models >>>>