Size: 96 x 96mm.
Control output 1: relay output.
Control output 2: relay output.
Auxiliary output: 2 independent points.
Power supply voltage: AC100 ~ 240V.
Terminal shape: screw terminal table type.
Input category: full range multi input.
Heating wire break, SSR fault detection function: 1 points .
Communication: RS-485.
Event input: 6 points F3SN-A0472P25-02TS.
Remote SP input: there.
Transfer output: have
F3SN-A0472P25-02TS
Large screen display white PV legible. From selection to setting and operation are simple and easy to use.
Full capacity, function and performance of I/O. Suitable for more applications.
E5AC white LCDPV display height is about 25mm.
The upper panel and the front panel are equipped with tool ports F3SN-A0472P25-02TS.
With the communication conversion line (sold separately) connected to the computer to establish the controller without the need to install the wire for power supply.
Easy to install CX-Thermo (sold separately).
50ms high speed sampling period.
Model can be equipped with up to 4 point auxiliary output, 6 point event input,
1 point transfer output and remote SP input, suitable for a wide range of applications F3SN-A0472P25-02TS.
The main body is short, the thickness is only 60mm.
Easy to use programmable logic controller (PLC) is connected to the programmable logic controller (PLC).
The temperature controller is connected to each other by using the component communication.
A new type of proportional control allows you to control the valve. Time specification: Instantaneous type.
Current setting range: 20 to 65 A.
Operating voltage: 100/110/120 VAC.
Resetting method: Automatic (See note.).
Solid-state Relay Enables Choice of Three.
Operating Functions (Overcurrent, Open,
phase, and Reverse-phase).
Protects 3-phase induction motors and their loads from damage.
Selection and combination of operating functions from overcur,
rent, open-phase, and reverse-phase.
Circuit and output relay operation can be checked by just operat,
ing the test button.
The set time value can be checked easily bbecause operation time,
is indicated from the start of operation F3SN-A0472P25-02TS.
Space-saving, integrated construction.
Note: If the K2CM is used with an inverter, the operating conditions will,
depend on the load wiring length, inverter carrier frequency, basic,
frequency, annd load conditions F3SN-A0472P25-02TS. Error will occur in the operating,
values of the overload elements. It is recommended to test operation,
before using the K2CM.
F3SN-A0472P25-02TS Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=F3SN-A0472P25-02TS&select=5