LK Automation Limited LK Automation Limited
Brand Sort: OMRON | MITSUBISHI | Proface | Mennekes | Yaskawa
Home >> Price
SW1D5C-QPTU-E
No PHOTO
MITSUBISHI SW1D5C-QPTU-E
Length: 5.0m.
Specification: TB-FX round cable. Motor series: ultra low inertia, low power.
Rated output power: 0.2kw.
Rated speed: 3000r/min.
Whether to take the brake: No.
Shaft keyway: (open slot).
Protection level: IP55 does not include the shaft part and the connector.
Features: ultra low inertia is suitable for high frequency operation SW1D5C-QPTU-E.
Application examples: the insertion device, the assembly machine SW1D5C-QPTU-E
Input and output points: 512 points.
Input / output data points: 512 points.
Program capacity: 14K.
Basic command processing speed (LD command) s:0.20.
Coaxial data communication line function.
Each scanning process. Focus on the input signal sampling SW1D5C-QPTU-E. Focus on the output signal to refresh .
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program SW1D5C-QPTU-E.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
User program storage capacity: it is a measure of how much the user application can store the number of indicators.
Usually in words or K words as units. 16 bit binary number is a word,
Every 1024 words are 1K words. PLC to store instructions and data in words.
General logical operation instructions each account for 1 words. Timer / counter,
Shift instruction accounted for 2 words. Data operation instructions for 2~4. Fiber optic cable / twisted pair cable.
Single bus.
Remote I/O station.
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system.

MITSUBISHI PLC initiallization procedure SW1D5C-QPTU-E. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program arre:: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc SW1D5C-QPTU-E. .
SW1D5C-QPTU-E Operation manual/Instructions/Model selection sample download link: /searchDownload.html?Search=SW1D5C-QPTU-E&select=5


...more relevant model market price >>>>
Related products