MITSUBISHI inverter series: FR-F840.
Voltage level: three phase 400V.
Power: 55kw.
SLD converter rated current: 116A.
Structure and function: Standard model.
Type: CA.
Substrate coating: have.
The motor efficiency is not changed in the previous optimal excitation control,
At the same time, the newly developed advanced optimal excitation control can obtain larger torque at startup Q6TA32.
No need to adjust the parameters (plus deceleration time or torque, etc
Q6TA32), in a short time to speed up to a certain speed,
Can be carried out to maximize the efficiency of energy-saving drive motor.
The automatic tuning function of the loop constant of the motor is not consistent with the constant of the motor, the motor of other manufacturers, and the length of wiring is too long,
Optimum operating characteristic drive motor Q6TA32.
In the state of the sensor can not only drive the high efficiency and energy saving motor and PM motor (MM-EFS), but also can drive other companies induction motor and PM motor (permanent magnet synchronous motor).
Other manufacturers of induction motors, can also be automatically tuned to achieve the best excitation control, thus expanding the use of energy saving Q6TA32. The length of the line: 10M.
IP level: IP65.
Direct type.
The cable is not shielded.
Bending life: standard.
Connector kit for motor electromagnetic brake.
Cable for electromagnetic brake, for HF-KP/HF-MP series (motor shaft with side extraction). Output points: 16 points.
Output voltage and current: DC12/24V.
Output response time: 2ms.
16 point /1 a public side.
Output form: transistor output, leakage type.
40 point terminal station.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initiall state display, etc Q6TA32..
MITSUBIISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of thee prrogram Q6TA32.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.
Q6TA32 Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=Q6TA32&select=5