LK Automation Limited LK Automation Limited
Brand Sort: OMRON | MITSUBISHI | Proface | Mennekes | Yaskawa
Home >> Price
MR-J2S-350B-T004
No PHOTO
MITSUBISHI MR-J2S-350B-T004
MITSUBISHI motor universal AC servo amplifier MELSERVO-J3 series.
Rated output: 0.6kw.
Interface type: SSCNET type III fiber communication.
Full closed loop control.
Power specification: three phase AC400V.
High precision and high response location control.
Full closed loop control can be realized by double feedback control method .
Dual feedback control can be performed between the servo motor encoder and the load side encoder MR-J2S-350B-T004
MR-J3-B-RJ006 can be used in conjunction with a number of manufacturers of linear encoder,
Users can build the system according to their own accuracy requirements. ABS type linear encoder using serial interface,
No need to install the battery on the servo amplifier can easily build the absolute position detection system MR-J2S-350B-T004.
Flexible system configuration.
Can achieve higher load side positioning accuracy!DC input points: 32 points.
Input voltage and current: 3/7mA, DC12/24V.
Response time: 10ms.
Positive pole sharing.
Output points: 16 points.
Output voltage and current: 100mA/1, DC12/24V point.
Response time: 2ms MR-J2S-350B-T004.
48 point /1 public side (input and output sharing) .
Output form: transistor output, leakage type.
40 pin connector.
Number of stations: 1 stops.
Type remote I/O unit (twisted pair data connection).
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system.
MITSUBISHI PLC detection, fault diagnosis and display and other procedures.
These procedures are relatively independent, generally in the basic completion of the program design and then add.
Hardware simulation method is to use a number of hardware equipment to simulate the generation of the signal,
The signals are connected to the input end of thee PLC system in a haard wired way, and the timeliness is strong MR-J2S-350B-T004.
Software simulation method is in the MITSUBISHI PLC in the preparation of a set of simulation program,
The simulation provides the field signal, which is simple and easy to operate, but it is not easy too gguarantee the timeliness MR-J2S-350B-T004.
Simulation of the process of debugging, debugging method can be used to segment, and the monitoring function of programmer.
MR-J2S-350B-T004 Operation manual/Instructions/Model selection sample download link: /searchDownload.html?Search=MR-J2S-350B-T004&select=5


...more relevant model market price >>>>
Related products