Series Name: A950GOT.
Size: 6 inches.
Resolution: 320 * 240.
Display device: STN color display.
Display color: 8 color.
Power supply: DC24V.
Built in RS-422 communication interface
Memory card: 3M.
Some mechanical industries, such as machine tools, textile machinery, electronic equipment and other industries,
In the country has been developed for decades of history, relatively speaking, is relatively mature industry, in the long run,
These industries also exist the needs of equipment upgrades
HC-MFS053BG1(1/20)
In this upgrading process, there will be some small, has been using relatively low-end products manufacturers are eliminated,
But there are also a lot of enterprises in the process of equipment renewal,
Re positioning the needs to find those that can meet their development plans,
Equipment suppliers to help them improve their productivity HC-MFS053BG1(1/20). Input points: 32 points.
Voltage: DC12/24V.
Current: 2.5/5mA.
Response time: 0.2ms.
8 points / a common end.
Positive / negative sharing.
38 point terminal station.
Each scanning process. Focus on the input signal sampling HC-MFS053BG1(1/20). Focus on the output signal to refresh .
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference. Therefore PLC selection,
Under tthe premise of meeeting the control requirements,
Should consider the best performance to price ratio, a reasonable choice of PLC HC-MFS053BG1(1/20).
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program tto do the compiler to compile the process of interpretation HC-MFS053BG1(1/20).
Read only memory. Manufacturers use, content can not be changed, power does not disappear.
HC-MFS053BG1(1/20) Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=HC-MFS053BG1(1/20)&select=5