Input voltage range: AC100-240V.
Output voltage: DC5V.
Output power: 8.5A.
Simplified program debugging.
Can use the software with the implementation of the conditions of the test function, any step in the program,
Changes the value of the soft component to a user specified value.
In the past, when debugging the specific loop process, the need to add a set of soft components of the program,
At present, through the use of the function, no need to change the program, you can make a specific loop program segment execution action
GT11-50PSGB
Therefore, do not need to change the program separately in order to debug, debugging operation is more simple.
Through the expansion of soft components, more convenient to create the program GT11-50PSGB.
M soft components and B soft components can be expanded to 60K points, making the program easier to understand.
Auto backup key data.
Save the program and parameter files automatically to the program memory (ROM Flash) without using the backup battery,
To prevent the loss of the program and the parameters due to forgetting to replace the battery GT11-50PSGB.
In addition, the soft component data and other important data can be backed up to the standard ROM,
In order to avoid during the long holiday and other planned downtime,
The data is lost due to battery depletion .
The next time the power is turned on, the backup data will be automatically restored.Input and output points: 1024 points.
Input / output data points: 8192 points.
Program capacity: 14K.
Basic command processing speed (LD command) s:0.20.
Integral type: the PLC components are installed together or a few pieces of printed circuit board,
And together with the power supply installed in the casing to form a single overall called the host or the basic unit, small, ultra small PLC using this structure.
Modular: PLC is the basic components of a separate module.
Medium and large PLC used this way. Easy maintenance.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
User program storage cappacity: it is a measure of how much the user application can store the number of indicators GT11-50PSGB.
Usually in words or K words as units. 16 bit binary number is a word,
Every 1024 words are 1K words. PLC to store instructions and data in words.
General lloggical operation instructions each account for 1 words GT11-50PSGB. Timer / counter,
Shift instruction accounted for 2 words. Data operation instructions for 2~4.
GT11-50PSGB Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=GT11-50PSGB&select=5