Max input / output points: 60 points.
Power supply voltage: 12-24VDC.
Input points: 36 points.
Output points: 24 points.
Output type: relay.
Power consumption (W): 20.
Weight (kg):0.8.
Size (WxHxD) mm:175x90x75.
Terminal row type standard machine with extended input output
Can also be less of a system with analog or communication, etc . .
CPU, power supply, input and output integration GT09-C200R4-6C.
Display module or function expansion board can be less installed
GT09-C200R4-6C
In addition, you can also reduce the input output or special module.
Built in 8000 step EPROM memory.
No battery. Maintenance free.
Overseas oriented products meet all kinds of international standards.
FX1N series is a very powerful micro PLC, can be extended to up to 128 I/O points,
And can increase the special function module or the expansion board GT09-C200R4-6C.
Communication and data link function options make FX1N in the volume, communication and special function modules and other important applications is very perfect.
A PLC unit can output 2 100KHz pulses at the same time,
PLC is equipped with 7 special positioning instructions,
Including zero return, absolute position readout, absolute or relative drive, and special pulse output control GT09-C200R4-6C. Analog input: 2.
Analog output points: 1 points.
Weight: 0.1kg.
FX3 series can be connected to the 2 channel input (voltage: DC0~10V, or current DC4~20mA), as well as 1 channel output (DC0~10V, or current: DC4~20mA) of the adapter.
Each channel can be specified as a current input or voltage input.
Connecting FX3SA, FX3S, FX3GA, FX3G, and FX3U main body, the need to convert the adapter or function expansion board. Output points: 4 points.
Output voltage and current: DC12/24V.
Output response time: 2ms.
4 point /1 a public side.
Output form: transistor output, leakage type.
16 point terminal station.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state ddisplay, etc GT09-C200R4-6C..
MITSUBIISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of thee prrogram GT09-C200R4-6C.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.
GT09-C200R4-6C Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=GT09-C200R4-6C&select=5