MITSUBISHI inverter FR-E720 series.
Voltage level: 3 phase 200V.
Frequency converter capacity: 3.7KW.
In order to ensure the reliability of production, all production machinery in the design of power with drive, there is a certain amount of surplus.
When the motor can not run under full load, in addition to meet the requirements of power driven,
The surplus torque increases the active power consumption, resulting in the waste of electric energy
FX3U-3A-ADP
Speed control method of fan and pump equipment traditional by regulating the entrance or exit of the baffle, valve opening to regulate air flow and water flow
, the input power is large, and a large amount of energy consumption in the baffle, the valve in the process of closure FX3U-3A-ADP.
When using variable frequency control, if the flow rate is reduced, the speed of the pump or fan can be reduced to meet the requirements. Input and output points: 2048 points.
Input / output data points: 8192 points.
Program capacity: 30K.
Basic command processing speed (LD command) s:0.15.
Integral type: the PLC components are installed together or a few pieces of printed circuit board,
And together with the power supply installed in the casing to form a single overall called the host or the basic unit, small, ultra small PLC using this structure FX3U-3A-ADP.
Modular: PLC is the basic components of a separate module.
Medium and large PLC used this way. Easy maintenance.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
User program storage cappacity: it is a measure of how much the user application can store the number of indicators FX3U-3A-ADP.
Usually in words or K words as units. 16 bit binary number is a word,
Every 1024 words are 1K words. PLC to store instructions and data in words.
General lloggical operation instructions each account for 1 words FX3U-3A-ADP. Timer / counter,
Shift instruction accounted for 2 words. Data operation instructions for 2~4.
FX3U-3A-ADP Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=FX3U-3A-ADP&select=5