Cable length: 3m.
The connection between the FXCPU (MINI-DIN8 pin connector) and the graphic operation terminal.
Connection between FXCPU communication function extension board (MINI-DIN8 pin connector) and GOT.
Applicable models: GT10, GT21. Input type: DC input, positive public end / negative public end .
Input points: 32 points.
Enter the response time: 1 FX2N-CNV-BD. 5ms the following.
Rated input voltage / current: DC24V/5mA
FX2N-CNV-BD
External connection: 1 wire.
Fast connector type.
Simple wiring through quick connector.
Can be installed along the 6 direction.
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of the program FX2N-CNV-BD.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation. Motor series: low inertia, medium capacity.
Rated output power: 6.0kw.
Rated speed: 1000rpm.
With the brake: without FX2N-CNV-BD.
Shaft end: straight shaft .
The rotor of the servo motor is a permanent magnet, which is controlled by the U/V/W,
The rotor rotates under the action of the magnetic field, and the encoder feedback signal of the motor is given to the driver,
According to the feedback value and the target value, the driver adjusts the rotation angle of the rotor.
Accuracy of the servo motor depends on the accuracy of the encoder (number of lines). SRAM memory card.
RAM capacity: 1MB. Twisted pair cable.
Single bus.
Control unit.
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the systemm FX2N-CNV-BD.
MITSUBISHI PLC initiallization procedure . After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program arre:: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc FX2N-CNV-BD. .
FX2N-CNV-BD Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=FX2N-CNV-BD&select=5