MITSUBISHI inverter FR-F720 series.
Voltage level: three phase 200V.
Frequency converter capacity: 3.7KW.
When the inverter is running, the starting current and starting torque of the motor are how?
With the operation of the inverter, with the acceleration of the motor to improve the frequency and voltage,
The starting current is limited to 150% below the rated current (according to the different types of aircraft, 125%~200%)
A9GT-70LTT
Starting with power frequency power supply, the starting current is 6~7 times of the rated current, therefore, the impact on the mechanical and electrical.
The inverter drive can be smoothly start (start time longer).
The starting current is 1 A9GT-70LTT. 2~1.5 times of the rated current, and the starting torque is 70%~120% rated torque;
For the inverter with the torque automatic enhancement function, the starting torque is more than 100%, which can start with full load . Drive: MR-H_ACN series SSC-NET compatible AC servo.
Rated output: 0.4KW.
The servo controller can easily transfer the operation module and the field bus module through the automation interface,
At the same time using different fieldbus modules to achieve different control modes (RS485, RS232, optical fiber, InterBus, ProfiBus),
And the control mode of general inverter is single A9GT-70LTT.
The servo controller is directly connected with a rotary transformer or an encoder, which forms a closed loop of speed and displacement control.
The general inverter can only form an open loop control system.
Servo controller of the control parameters (such as steady-state accuracy and dynamic performance) is better than the general inverter. Temperature sensor: PT100, 3 wire system.
The A1S62RD3 and A1S62RD4 temperature sensor input modules allow the platinum resistance temperature sensing element to be directly connected to the PLC,
This component converts a signal from a temperature measuring element to a numeric value that represents a temperature measurement value,
This temperature value can be used for the control process.
The length of time required to execute the instruction, the length of the user''s program, the type of instruction, and the speed of the CPU execution are very significant,
Generally, a scanning process, the fault diagnosis time,
Communication time, input sampling and output refresh time is less,
The execution time is accounted for the vast majority of.
The response time of PLC is the interval between the time of the change of the external output siignal of the PLC and the time of the change of the external output signal which is controlled by it,
Lag time, this is the time constant of the input circuit,
The time constant of the output circuit, the arrangement of the user statement and the usse oof the instruction,
The cycle scan mode of PLC and the way of PLC to refresh the I/O and so on A9GT-70LTT A9GT-70LTT.
This phenomenon is called the I/O delay time effect.