Cable length: 30m.
For connection between FXCPU (MINI-DIN8 pin connector) and GOT.
Connection between FXCPU communication function extension board (MINI-DIN8 pin connector) and GOT.
Applicable models: GT10, GT21. Transmission line unit for MELSECNET/MINI (-S3) twisted pair data link.
Loop: twisted pair I/F .
Remote station: light I/F (plastic fiber) NZ2GF2B-60AD4.
MITSUBISHI PLC protection and chain procedures
NZ2GF2B-60AD4
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system NZ2GF2B-60AD4.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of the program NZ2GF2B-60AD4.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation. Output points: 16 points.
Voltage: DC24V/AC240V, 2A/1 point, 16A/1 public end.
OFF leakage current: 0.1mA.
Output type: relay output.
Response time: 12ms.
8 point /1 a public side.
20 point terminal station.
With the surge absorber.
The number of I/O thyristor DC motor control required tube DC motor speed control system is the main form of DC speed regulation,
The thyristor rectifier unit is used to supply power to the DC motor.
PLC control of the DC drive system, the input of the PLC in addition to the main signal outside the signal,
We need to consider the switching signal, the fault signal transmission device, brake signal and fan fault signal.
The output of the PLC mainly consider the speed command signal positive 1~3 level, 1~3 level, allowing reverse switching signal and brake open signal etc..
In general, a reversible DC drive system controlled by PLC is approximately 12 input points and 8 output points,
An irreversible DC drive system requires 9 inputs and 6 output points.
MITSUBISHI PLC is the main product in the production of MITSUBISHI motor in Dalian.
It uses a kind of programmable memory for its internal storage procedures,
Execute logic operation, sequence control, timing, counting and arithmetic operations, user oriented instruction,
And through digital or analog input / output control of various types of machinery or production process.
Control solenoid valve required I/O points by the action priinciple of the solenoidd valve can be known,
A single coil solenoid valve with PLC control to 2 input and 1 output,
A double coil solenoid valve requires 3 inputs and 2 outputs,
A button needs an input; a light sensitive switch needs 4 or 2 inputs,
A signal lamp needs 1 outtput, band switch,
Several bands are required for several inputs,
In general, a variety of position switches are required to take up 2 input points NZ2GF2B-60AD4 NZ2GF2B-60AD4.
NZ2GF2B-60AD4 Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=NZ2GF2B-60AD4&select=5