LK Automation Limited LK Automation Limited
Brand Sort: OMRON | MITSUBISHI | Proface | Mennekes | Yaskawa
Home >> Price
MR-J3-350B4-RJ004
MITSUBISHI MR-J3-350B4-RJ004
3C-2V/5C-2V coaxial cable between the single bus PC network (control station / common station) / remote I/O network (remote master).
The response time of PLC is the interval between the time of the change of the external output signal of the PLC and the time of the change of the external output signal which is controlled by it,
Lag time, this is the time constant of the input circuit,
The time constant of the output circuit, the arrangement of the user statement and the use of the instruction,
The cycle scan mode of PLC and the way of PLC to refresh the I/O and so on MR-J3-350B4-RJ004
This phenomenon is called the I/O delay time effect.
Switch volume control is designed to,
According to the current input combination of the switch quantity and the history of the input sequence,
So that PLC generates the corresponding switching output,
In order to make the system work in a certain order MR-J3-350B4-RJ004.
So, sometimes also known as the order control.
And sequential control is divided into manual, semi-automatic or automatic.
And the control principle is decentralized, centralized and hybrid control three MR-J3-350B4-RJ004. Three-phase 4 wire type .
Measuring circuit number: 3 circuits.
Measurement items: power consumption (consumption, regeneration), current, voltage, power, power factor, etc..
Power measurement module product group capable of simply measuring various energy information.
With only one module can be used to measure and power consumption (consumption and regeneration), reactive power, current, voltage, power, power factor and frequency of all kinds of detailed information.
No ladder program can continue to monitor the minimum and maximum values, can also perform 2 types of upper / lower limit alarm.
Only in the ON state can be used to measure the output of the output device.
Therefore, the amount of electricity and the quantity of electricity in the unit of the beat can be obtained during the operation of the equipment.
3 phhase 3 wire productts can be used to measure up to 4 circuits in one slot,
3 phase 4 wire products can be used to measure up to 3 circuits,
So the electrical energy measurement can be carried out in a small space by the multi circuit products MR-J3-350B4-RJ004.
For example, a module ccann be used to measure other loads from the control panel trunk MR-J3-350B4-RJ004.
In addition, Works2 GX (version 1.90U and higher) can be used to easily set parameters.
MR-J3-350B4-RJ004 Operation manual/Instructions/Model selection sample download link: /searchDownload.html?Search=MR-J3-350B4-RJ004&select=5


...more relevant model market price >>>>
Related products