Remote I/O controller, coaxial cable, coaxial loop system.
How to choose MITSUBISHI PLC.
MITSUBISHI PLC options include the choice of MITSUBISHI PLC models, capacity, I/O module, power, etc..
MITSUBISHI PLC distribution I/O points and design MITSUBISHI PLC peripheral hardware circuit
Draw the I/O point of the PLC and the input / output device connection diagram or the corresponding table,
This part also can be carried out in second steps
GT25-08PSGC
Design PLC peripheral hardware circuit.
Draw the electrical wiring diagram of the other parts of the system,
Including the main circuit and the control circuit does not enter the PLC, etc..
The electrical schematic diagram of the system composed of I/O PLC connection diagram and PLC peripheral electrical circuit diagram GT25-08PSGC.
So far the system''s hardware electrical circuit has been determined. MITSUBISHI inverter FR-A720 series.
Voltage level: 3 phase 200V.
Frequency converter capacity: 18.5KW.
Inverter general area of domestic enterprises to occupy more than 80% of the market share,
Production of frequency converter, motor soft starter and other industrial automation control of the manufacturers, the use of heavy-duty design products,
Overload capacity, with super large start and running capacity, improve the automatic detection, protection and control performance,
Can start and control any type of heavy duty motor,
Products have been widely used in metallurgy, mining, paper, chemicals, building materials, machinery, electricity, and construction systems and other industrial transmission areas GT25-08PSGC. Fast connector type.
Voltage input.
Number of channels: 8 channels.
Occupied the number of stations: Ver.1 mode occupied 3 stations, Ver.2 mode occupied 1 stations.
Station type: remote equipment station.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction.
Design control cabinet and the operating table and other parts of the electrical wiring diagram and wiring diagram.
Electrical interconnection diagram of each part of the design system.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program design and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced.
MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulattion debugging to furtherr carry on the on-line unification to adjust GT25-08PSGC.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on stepp bby step GT25-08PSGC.
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be.
GT25-08PSGC Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=GT25-08PSGC&select=5