LK Automation Limited LK Automation Limited
Brand Sort: OMRON | MITSUBISHI | Proface | Mennekes | Yaskawa
Home >> Price
GT1030-LWL
MITSUBISHI GT1030-LWL
DOS/V computer (D-SUB 9 pin)For A6TBXY36/A6TBXY54/A6TBX70E (common cathode; drain type) long 0.5m.MITSUBISHI inverter series: FR-F840.
Voltage level: three phase 400V.
Power: 0.75kw.
SLD converter rated current: 2.3A.
Structure and function: Standard model.
Type: CA.
Substrate coating: have.
2 times the power consumption of the wind turbine and pump and the speed of the 3 power consumption is proportional to the speed of the rotating speed GT1030-LWL
Through the speed control of the frequency converter to adjust the air flow, can reduce the power consumption.
Give full play to the performance of the motor.
The excitation current is always adjusted to the best state, which can improve the efficiency of the motor GT1030-LWL.
Load torque is smaller, can further improve energy efficiency.
For example, when a general motor is used, the optimal excitation control mode in the 4% motor load torque is about 30% more than that of the V/F control. Length: 2m.
Specification: MR-J. Motor series: low inertia, medium power.
Rated output power: 11.0kw.
Rated speed: 1500r/min.
Whether to bring the brakes: with GT1030-LWL.
Shaft end: Standard (straight) .
Voltage: 400V type.
Protection level: IP65 (IP67).
Features: low inertia from low speed to high speed, three modes can be selected, suitable for different application range. As a standard port, 30KW or greater power is suitable for flange (type) installation and support foot mounting.
Application example: injection molding machine, semiconductor manufacturing equipment, large conveyor machinery.
High resolution encoder 131072p/rev (17 bit).
The encoder with high resolution ensures excellent performance and stability at low speed.
All motor dimensions are the same as before and all are compatible with the wiring. Input and output points: 1024 points.
Input / output data points: 8192 points.
Program capacity: 60k.
Basic command processing speed (LD command) S:0.2.
PLC in the program execution stage: according to the order of the user program order to store the order of each instruction,
After the correspondinng operation and processinng, the result is written to the output status register,
The contents of the output status register are changed with the execution of the program GT1030-LWL.
Output refresh phase: when all instructions are executed,
The output status register is sent to the oouttput latch in the output refresh stage,
And through a certain way (relay, transistor or transistor) output, drive the corresponding output equipment GT1030-LWL.
GT1030-LWL Operation manual/Instructions/Model selection sample download link: /searchDownload.html?Search=GT1030-LWL&select=5


...more relevant model market price >>>>
Related products
MITSUBISHI
4.5 Inch Touch Screen
GT1030-LBD
MITSUBISHI 4.5 Inch Touch Screen GT1030-LBD
Series introduction: set a numer of as
MITSUBISHI
4.5 Inch Touch Screen
GT1030-LBLW
MITSUBISHI 4.5 Inch Touch Screen GT1030-LBLW
Series introduction: set a numer of as
MITSUBISHI
4.5 Inch Touch Screen
GT1030-LWL
MITSUBISHI 4.5 Inch Touch Screen GT1030-LWL
Series introduction: set a numer of as
MITSUBISHI
4.5 Inch Touch Screen
GT1030-LBD2
MITSUBISHI 4.5 Inch Touch Screen GT1030-LBD2
Series introduction: set a numer of as