MITSUBISHI inverter series: FR-F820.
Voltage level: three phase 200V.
Power: 90kw.
SLD converter rated current: 475A.
Structure and function: Standard model.
Type: CA.
Substrate coating: have.
PID target value can be set directly from the operator panel. Flexible change settings.
In the 1 inverter, through the PID control of parallel connection pump (up to 4 units) can adjust the amount of water and so on
FR-F720-0.75K
1 pumps driven by parallel connection of the pump machine, in addition to the pump for power frequency drive.
The number of power frequency driven pump, according to the automatic adjustment of water.
The liquid crystal panel options (FR-LU08) can be converted to a more intuitive display unit% units FR-F720-0.75K.
Through the use of wind, temperature and other familiar units can be simple to maintain and adjust the display. Input points: 32 points.
Input voltage: AC200 ~ 240V.
Current: 5mA.
Response time: 55ms.
16 points / a common end.
50 point terminal station.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program to do the compiler to compile the process of interpretation FR-F720-0.75K.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference. Therefore PLC selection,
Under the premise of meeting the control requirements,
Should consider the best performance to price ratio, a reasonable choice of PLC.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh FR-F720-0.75K.
The coontents of the component image register are changed with the change of the execution of the program .
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to thhe adoption of centralized sampling FR-F720-0.75K.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
FR-F720-0.75K Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=FR-F720-0.75K&select=5