Analog input channel number: 8CH.
accuracy
Ambient temperature of 25 plus or minus 5 degrees C: plus or minus 0.1%.
Ambient temperature 0 ~ 55 degrees C: plus or minus 0.3%.
Temperature coefficient.
Common
Conversion speed: 80 s/CH.
Channel to channel insulation.
Absolute maximum input: 30mA.
External wiring connection mode: 18 point screw terminal FR-A720-7.5K.
Voltage input
Analog input voltage: -.
Digital output value: -
FR-A720-7.5K
Current input
Analog input current: DC0 ~ 20mA.
Digital output value: 0 ~ 32000.
16 bit high resolution (1/32000).
No program can perform scaling and conversion operations.
The most suitable for the requirements of speed and accuracy of the detection equipment FR-A720-7.5K.
Easy to filter high frequency interference .
Execute event driven programs via alarm output.
Through the engineering software, the output of arbitrary analog waveform data.
Reduce downtime and reduce maintenance costs through anomaly detection
Works3 GX can be used to easily set the critical value of the input and output signals.
Can quickly detect the abnormal signal, so it can shorten the downtime, reduce maintenance costs FR-A720-7.5K.
Channel insulation can ensure the accurate signal transceiver.
Model with " -G " module in the channel between the insulation,
Isolation amplifiers are not required to prevent inter channel current and interference current. Screw, 2 piece type terminal
Temperature measuring resistor body input module.
Number of channels: 4 channels.
Number of stations: 1 stops.
Station type: remote equipment station.
MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulation debugging to further carry on the on-line unification to adjust.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on step by step.
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction.
Design control cabinet and the opeerating table and other parts of the electrical wiring diagram and wiring diagram FR-A720-7.5K.
Electrical interconnection diagram of each part of the design system.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program deesiign and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced FR-A720-7.5K.
FR-A720-7.5K Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=FR-A720-7.5K&select=5