Type: HA-SH series.
Rated output: 0.5KW.
Rated speed: 2000r/min.
Electromagnetic brake: there.
From the vector control technology of AC servo motor, it has become more and more popular.
From the point of view of the real time operating system, it is just a function module that needs to be processed in real time .
Due to the multi function of the controller, intelligent requirements, a large number of signal processing,
Establishment and operation of various mathematical models of adaptive control,
Network communications and other functional modules will be in the real-time operation of the unified scheduling and management of the system to get the correct and reliable operation
CL9-TERM
Therefore, the next generation of servo drive controller will be a collection of various modern control technology of the crystallization,
Instead of the traditional sense of power amplifier CL9-TERM. 256MB flash ROM.
Applicable models: GT16, GT15, GT11, HandyGOT. Cable flat cable;
Connector with 20 pin installed at both ends of the fuse.
Length 3M. RS-232:1, RS-422/485:1.
Transmission speed: 0 CL9-TERM. 3 ~ 19.2kpbs.
Computer connection function .
So far the system''s hardware electrical circuit has been determined.
Printer / peripheral device connection, BASIC language function.
How to choose MITSUBISHI PLC.
MITSUBISHI PLC options include the choice of MITSUBISHI PLC models, capacity, I/O module, power, etc..
MITSUBISHI PLC distribution I/O points and design MITSUBISHI PLC peripheral hardware circuit
Draw the I/O point of the PLC and the input / output device connection diagram or the corresponding table,
This part also can be carried out in second steps.
Design PLC peripheral hardware circuit.
Draw the electrical wiring diagram of the other parts of the system,
Including the main circuit and the control circuit does not enter the PLC, etc..
The electrical schematic diagram of the system composed of I/O PLC connection diagram and PLC peripheral electrical circuit diagram. SSCNET III connector kitME-NET interface unit.
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the sysstem CL9-TERM.
MITSUBISHI PLC initiallization procedure . After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program arre:: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc CL9-TERM. .
CL9-TERM Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=CL9-TERM&select=5