LK Automation Limited LK Automation Limited
Information sort OMRON | MITSUBISHI | Proface | Mennekes | Yaskawa
Home >> Supply
Q81BD-J71GP21-SX IE CC-Link controller network MITSUBISHI Q81BD-J71GP21-SX


2 slots.
Extended substrate.
No need to install power module.
Used to install Q series modules.
Reduce system downtime recovery time.
With a simple operation, you can back up all the data in the CPU to the memory card.
Through regular backup, can be the latest parameters, procedures, etc Q81BD-J71GP21-SX. to save the storage card.
In the eevent of a CPU failure, after the replacement of CPU, can be a simple operation,
Restore the system by using the data storage card in advance.
Therefore, it is not necessary to spend time to manage the backup data, but also can shorten the recovery time of the system shutdown Q81BD-J71GP21-SX.
Wider application range, more advanced.
Leading in the era of the Q series CPU products.
Q series CPU products a wide range of applications,
Provide programmable controller, process, redundancy, C language, movement, manipulator, CNC all kinds of CPU,
In order to meet the needs of various control Q81BD-J71GP21-SX.
Through the multi CPU configuration, can be based on the use of the scale, purpose,
Construction of the best system to meet the requirements of all kinds of control MITSUBISHI Q81BD-J71GP21-SX.
In addition, the high reliability system can be constructed by the redundant system,
Even if a fault occurs, the system can continue to run.Output: 2 channels.
Input (resolution): 0~12000; -12000~12000; 0~12000; -16000~16000.
Output DC0~20mA; DC-12~12V MITSUBISHI Q81BD-J71GP21-SX.
Conversion speed: 10ms/1 channel.
18 point terminal station.
Isolation between channels.
The possibility of expanding control with intelligent function.
At the same time, the channel isolation analog module realizes high isolation voltage,
Further improve the accuracy of the benchmark MITSUBISHI Q81BD-J71GP21-SX.
Provide support for process control using a general purpose programmable controller.
Flow meter, pressure meter, other sensors can be directly connected to analog input,
Control valve can also be directly connected to analog output.
Hardware and installation costs have been greatly reduced due to the need for an external isolation amplifier.
High insulation strength.
Can isolate electrical interference, such as current and noise, etc..
Standard analog input module.
Isolated analog input module.
No external isolation amplifier required.
Without the use of inter channel isolation analog modules.
Using the inter channel isolation analog module.
Express PCI bus.
Support Japanese, English OS.
Multimode fiber optic cable.
Dual loop controller network (control station / common station).
Province distribution network module in cabinet and device.
Link to connect the 64 stations when the fastest scanning time for 1.2ms (rate 2.5Mbps).
According to the transmission distance, the transmission rate is selected from 2.5Mbps, 625kbps and 156kbps.
CC-Link/LT from the station does not need any parameter settings.
Only need to set up the transmission speed in the master module, you can use the remote I/O.
I/O control in the first class of open field network module.
CC-Link based on reliable field bus technology,
Able to transmit large number of bits data (such as ON/OFF information) and word data (such as analog information).
Consistency of CC-Link to maintain loop transmission,
And the cycle of transmission and information (instantaneous transmission) communication separately, so as to ensure the timeliness of.
Even if the information reaches saturation, it will not affect the link scan time.
Make the mixed data environment intelligent, to achieve a new manufacturing system IE CC-Link field network module.
Using Ethernet cables and connectors available on the market to reduce costs.
High speed communication capable of communicating with 1Gbps.
Improve the communication response, significantly shorten the cycle time.
Improve the performance of cycle data update. Reduces the transmission delay time and the application of the synchronization waiting time.
Data can be read or written to other station programmable controller.<
Status of IE CC-Link field network can be confirmed by Works2 GX Q81BD-J71GP21-SX.
Can be in the Works2 GX up and down the abnormal position, the cause of the exception, the event record,
So it can reduce the time of abnormal to resume normal operation.

Related supply information