High performance type CPU, process CPU, memory card protection cover for redundant CPU.
Q3MEM-4MBS-SET bundled products.E81WH4W, QE83WH4W special transformer.
Power measurement module product group capable of simply measuring various energy information.
With only one module can be used to measure and power consumption (consumption and regeneration), reactive power, curreent, voltage, power, power factor and frequency of all kinds of detailed information Q80BD-J71LP21-25.
No ladder program can continue to monitor the minimum and maximum values, can also perform 2 types of upper / lower limit alarm Q80BD-J71LP21-25.
Only in the ON state can be used to measure the output of the output device.
Therefore, the amount of electricity and the quantity of electricity in the unit of the beat can be obtained during the operation of the equipment Q80BD-J71LP21-25.
3 phase 3 wire products can be used to measure up to 4 circuits in one slot,
3 phase 4 wire products can be used to measure up to 3 circuits,
So the electrical energy measurement can be carried out in a small space by the multi circuit products.
For example, a module can be used to measure other loads from the control panel trunk MITSUBISHI Q80BD-J71LP21-25.
In addition, Works2 GX (version 1.90U and higher) can be used to easily set parameters.
PCI bus.
Support Japanese, English OS.
SI/QSI/H-PCF/ broadband H-PCF cable.
Dual loop controller network (control station / common station) MITSUBISHI Q80BD-J71LP21-25.
Make the mixed data environment intelligent, to achieve a new manufacturing system IE CC-Link field network module.
Using Ethernet cables and connectors available on the market to reduce costs.
High speed communication capable of communicating with 1Gbps MITSUBISHI Q80BD-J71LP21-25.
Improve the communication response, significantly shorten the cycle time.
Improve the performance of cycle data update. Reduces the transmission delay time and the application of the synchronization waiting time.
Data can be read or written to other station programmable controller.
Status of IE CC-Link field network can be confirmed by Works2 GX.
Can be in the Works2 GX up and down the abnormal position, the cause of the exception, the event record,
So it can reduce the time of abnormal to resume normal operation.
Province distribution network module in cabinet and device.
Link to connect the 64 stations when the fastest scanning time for 1.2ms (rate 2.5Mbps).
According to the transmisssion distance, the transmission rate is selected from 2 Q80BD-J71LP21-25.5Mbps, 625kbps and 156kbps.
CC-Link/LT from the station does not need any parameter settings.
Only need to set up the transmission speed in the master module, you can use the remote I/O.