LK Automation Limited LK Automation Limited
Information sort OMRON | MITSUBISHI | Proface | Mennekes | Yaskawa
Home >> Supply
MITSUBISHI AJ65BTB2-16DR DC input / relay output module MITSUBISHI AJ65BTB2-16DR



Input type: DC input, positive public end / negative public end.
Input points: 8 points.
Enter the response time: 10ms the following.
Rated input voltage / current: DC24V/7mA.
Output form: relay output.
Output points: 8 points.
OFF leakage current: -.
Output protection function: No AJ65BTB2-16DR.
Rated load voltage / current:: DC12V/AC240V/2A.
External connection: 2 line /2 line type.
Type of input and output terminal.
Using 2 pieces of structure of the terminal units, maintenance can be maintained in the same line under the condition of the replacement module AJ65BTB2-16DR. I/O slots: 8 slots.
Outline dimension: 430*130.
CPU basic board can be plugged into 1 power modules,
1 CPU components and a maximum of 2, 3, 5, or 8 single slot size special function components and I/O components are respectively inserted and arranged AJ65BTB2-16DR.
Expansion ports are arranged on both sides of the base plate,
For connecting the expansion board for.
Up to 3 extension substrates. Enter points: 64 points.
Voltage: DC12/24V.
Current: 3/7mA.
Response time: 10ms MITSUBISHI AJ65BTB2-16DR.
32 points / a common end.
Cathode common.
40 pin connector.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program to do the compiler to compile the process of interpretation.
Read only memory MITSUBISHI AJ65BTB2-16DR. Manufacturers use, content can not be changed, power does not disappear.
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference MITSUBISHI AJ65BTB2-16DR. Therefore PLC selection,
Under the premise of meeting the control requirements,
Should consider the best performance to price ratio, a reasonable choice of PLC.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed oof executing instructions AJ65BTB2-16DR.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.

Related supply information