LK Automation Limited LK Automation Limited
Information sort OMRON | MITSUBISHI | Proface | Mennekes | Yaskawa
Home >> Supply
A1S65B-S1 MITSUBISHI A1S65B-S1


Optional features of memory card (Q/QnA/A/FX compatible).
4MB extended memory.
Applicable models: A985 (-V) /975/970/A960GOT (-B) /A956WGOT. 8 slots.
Power supply unit.
QnA series unit installation.
High speed access.
CE logo fit.
I/O points is an important indicator of PLC A1S65B-S1.
Reasonable selection of I/O points can not only satisffy the control requirements of the system,
And the total investment of the system is the lowest.
The input and output points and types of PLC should be determined according to the analog quantity and switch quantity of the controlled object,
Generally an input / output element to take up an input / output point A1S65B-S1.
Taking into account the future adjustment and expansion,
In general should be estimated on the total number of points plus the amount of spare 20%~30% A1S65B-S1.
When the programmer input programinto the user program memory,
Then CPU according to the function of the system (the system program memory to explain the compiler),
Translate the user program into PLC internally recognized by the user to compile the program MITSUBISHI A1S65B-S1.
Relay output interface circuit of PLC
Working process: when the internal circuit output digital signal 1,
There is a current flowing through, the relay coil has a current, and then the normally open contact is closed,
Provide load current and voltage.
When the internal circuit outputs a digital signal 0, there is no current flowing through it,
The relay coil does not have a current, and the normally open contact is broken off,
A current or voltage that is disconnected from the load MITSUBISHI A1S65B-S1.
It is through the output interface circuit to the internal digital circuit into a signal to make the load action or not action MITSUBISHI A1S65B-S1.
I/O slots: 5 slots.
Could you install the power module.
Outline dimension: 315*130.
There are two types of extended floor,
A power module can be inserted, and the other one is not.
The choice of any type of substrate depends on the total DC5V current consumption and the power supply on the CPU main substrate.
If the total demand is less than the power output, no additional power supply,
Then you can choose a more economical expansion board.
Both ends of the main base plate of the CPU have an expansion interface, and can be used for extending the cable connection. AC input points: 32 points.
Input voltage and current: AC100 ~ 10mA, 120V.
Response time: 25ms.
16 point /1 a public side.
Relay output points: 24 points.
Output voltage and current: DC24V/AC240V, 2A/1 point, 5A/1 common end.
Response time: 12ms.
8 point /1 a public side.
36 point terminal table * 2.
Number of stations: 8 stops.
Compact remote I/O unit.
Equipment layer / field bus CC-Link device layer is the PLC and other control devices and sensors and drive devices connected to the field network,
Network for the lowest layer of the whole network system.
Using CC-Link field bus connection, the number of wiring is greatly reduced,
Improve the maintainability of the system.
And, not just the amount of data ON/OFF and other switches,
Can also be connected to the ID system, bar code reader, inverter, man-machine interface and other intelligent devices,
From the completion of a variety of data communication, the management of the terminal production information can be realized,
On the centralized management of the state of the machine movement,
Make maintenance work efficiency also greatly improved.
Q series PLC in the use of CC-Link function better,
And easier to use.
Mitsubishi Co PLC network inherited the traditional use of the MELSEC network,
And make it better in terms of performance, function, easy to use etc..
Provides a layer of three layers of clear network, to provide the most suitable network products for a variety of uses.
The information layer /Ethernet (Ethernet) information layer is the highest level of the network system,
Mainly in the PLC, the device controller and production management with PC transmission between production management information, quality management information and the operation of equipment, etc.,
Information layer using the most common Ethernet.
It is not only able to connect the PC system UNIX, windows system, etc.,
And can connect a variety of FA devices.
The Ethernet module has the function of Internet e-mail receiving and sending,
The user can send and receive the production information conveniently iin any place of the world,
Build a remote monitoring management system A1S65B-S1.
At the same time, the use of the Internet FTP server functions and MELSEC protocol can be very easy to achieve the program upload / download and transfer of information.

Related supply information