LK Automation Limited LK Automation Limited
Download Sort: OMRON | MITSUBISHI | Proface | Mennekes | Yaskawa
Home >> Catalog Download
MITSUBISHI AY42-S3 datasheet PDF
Product model: AY42-S3
Name: Transistor output module
Brand: MITSUBISHI
Sort: PDF datasheet
File language: English
Capable of continuous thermocouple or platinum temperature measurement.
In addition, the temperature measurement range can be set with the use of the temperature.
The length of time required to execute the instruction, the length of the user''s program, the type of instruction, and the speed of the CPU execution are very significant,
Generally, a scanning process, the fault diagnosis time,
Communication time, input sampling and output refresh time is less,
The execution time is accounted for the vast majority of AY42-S3 PDF AY42-S3
The response time of PLC is the interval between the time of the change of the external output signal of the PLC and the time of the change of the external output signal which is controlled by it,
Lag time, this is the time constant of the input circuit,
The time constant of the output circuit, the arrangement of the user statement and the use of the instruction,
The cycle scan mode of PLC and the way of PLC to refresh the I/O and so on AY42-S3 PDF.
This phenomenon is called the I/O delay time effect. Module for A3VTS multiplex system.
MITSUBISHI PLC detection, fault diagnosis and display and other procedures AY42-S3 PDF.
These procedures are relatively independent, generally in the basic completion of the program design and then add.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations. DC input points: 8 points.
Input voltage and current: 7mA, DC24V.
Input response time: 10ms.
8 point /1 a public side.
Positive / negative sharing.
Output points: 8 points.
Output voltage and current: DC24V/AC240V, 2A/1 point, 8A/1 common end.
Output response time: 12ms.
8 point /1 a public side.
Output form: relay.
40 point terminal station.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..
MITSUBISHI PLC program ssimulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of thee program AY42-S3 datasheet AY42-S3 datasheet.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.
Related products
MITSUBISHI
MELSECNET/MINI-S3 module
AJ71PT32-S3
MITSUBISHI MELSECNET/MINI-S3 module AJ71PT32-S3
Fier optic cale / twisted pair cale.
MITSUBISHI
B/NET module
AJ71B62-S3
MITSUBISHI B/NET module AJ71B62-S3
Signal transmission device B/NET interfa
MITSUBISHI
Ethernet interface module
A1SJ71E71-B2-S3
MITSUBISHI Ethernet interface module A1SJ71E71-B2-S3
Availale network: 10BASE2. Max / total
MITSUBISHI
CC-Link connection unit
AJ65BT-G4-S3
MITSUBISHI CC-Link connection unit AJ65BT-G4-S3
CC-Link peripheral device connection. RS