LK Automation Limited LK Automation Limited
Information sort OMRON | MITSUBISHI | Proface | Mennekes | Yaskawa
Home >> Supply
A1SCPU-S1 MITSUBISHI CPU unit A1SCPU-S1


Bus connection.
Program 1 channel connection.
MITSUBISHI PLC detection, fault diagnosis and display and other procedures.
These procedures are relatively independent, generally in the basic completion of the program design and then add.
MITSUBISHI PLC protection and chain procedures A1SCPU-S1.
Protection and chain is an indispensable part of the program, must bee carefully considered.
It can avoid the control logic confusion caused by illegal operations. DC input points: 16 points.
Input voltage and current: 7mA DC24V A1SCPU-S1.
Response time: 10ms.
16 point /1 a public side.
Positive / negative sharing.
34 point terminal station.
Number of stations: 2 stops.
Equipment layer / field bus CC-Link device layer is the PLC and other control devices and sensors and drive devices connected to the field network,
Network for the lowest layer of the whole network system A1SCPU-S1.
Using CC-Link field bus connection, the number of wiring is greatly reduced,
Improve the maintainability of the system.
And, not just the amount of data ON/OFF and other switches,
Can also be connected to the ID system, bar code reader, inverter, man-machine interface and other intelligent devices,
From the completion of a variety of data communication, the management of the terminal production information can be realized,
On the centralized management of the state of the machine movement,
Make maintenance work efficiency also greatly improved MITSUBISHI A1SCPU-S1 MITSUBISHI A1SCPU-S1.
Q series PLC in the use of CC-Link function better,
And easier to use.
Mitsubishi Co PLC network inherited the traditional use of the MELSEC network,
And make it better in terms of performance, function, easy to use etc MITSUBISHI A1SCPU-S1..
Provides a layer of three layers of clear network, to provide the most suitable network products for a variety of uses.
The information layer /Ethernet (Ethernet) information layer is the highest level of the network system,
Mainly in the PLC, the device controller and production management with PC transmission between production management information, quality management information and the operation of equipment, etc.,
Information layer using the most common Ethernet.
It is not only able to connect the PC system UNIX, windows system, etc.,
And can connect a variety of FA devices.
The Ethernet module has the function of Internet e-mail receiving and sending,
The user can send and receive the production information conveniently in any place of the world,
Build a remote monitoring management system.
At the same time, the use of the Internet FTP server functions and MELSEC protocol can be very easy to achieve the program upload / download and transfer of information.
Program memory capacity: 8k.
Input / output points: maximum 256 points.
A scan cycle of PLC must pass through three stages: input sampling, program execution and output refresh.
PLC in the input sampling phase: first of all, in order to sccan the sequence of all existing input latches in the input terminal of the state or input data read,
And write it into the corresponding input status register,
Refresh the input, then close the input port, enter the program execution stage A1SCPU-S1.

Related supply information