LK Automation Limited LK Automation Limited
Information sort OMRON | MITSUBISHI | Proface | Mennekes | Yaskawa
Home >> Supply
A1SC07B | MITSUBISHI Extension cable A1SC07B


Input type: DC input, negative public end.
Input points: 16 points.
Enter the response time: 1.5ms the following.
Rated input voltage / current: DC24V/5mA.
Output form: transistor output, source.
Output points: 16 points.
OFF leakage current: 0.1mA.
Output protection function A1SC07B.
Rated load voltage / current: DC24V/DC24V/0.1A.
External connection: 3 line /2 line type.
Sensor connector type (E-CON type).
Using industry standard E-CON type.
Simple wiring through sensor connector A1SC07B.
When installing the module can choose to use the DIN guide rail or screw mounting.
3 wire sensor input. Ontology CPU installation to P-ROM program device.DC input points: 4 points MITSUBISHI A1SC07B.
Input voltage and current: 7mA, DC24V.
Input response time: 10ms.
4 point /1 a public side A1SC07B.
Positive pole sharing.
Output points: 4 points.
Output voltage and current: DC24V.
Output response time: 2ms.
4 point /1 a public side.
Output form: transistor output, leakage type MITSUBISHI A1SC07B.
24 point terminal station.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure MITSUBISHI A1SC07B. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual statee of the scene,
Create the necessary environmental conditions for the operation of the program A1SC07B.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.

Related supply information