A0J2R25 MITSUBISHI Network module A0J2R25


Output type: transistor output, drain type.
Output points: 32 points.
OFF leakage current: 0.25mA.
Output protection function.
Rated load voltage / current: DC24V/DC24V/0.1A.
External connection: 1 wire.
Fast connector type.
Simple wiring through quick connector.
Can be installed along the 6 direction A0J2R25.
MITSUBISHI PLC programm simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of the program A0J2R25.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation. Input type: DC input, positive public end / negative public end A0J2R25.
Input points: 32 points.
Enter the response time: 1.5ms the following.
Rated input voltage / current: DC24V/5mA.
External connection: 1 wire.
40 pin connector type (FCN connector type).
Through the 40 pin connector type (FCN connector type) can be connected to a variety of devices MITSUBISHI A0J2R25.
Can be installed along the 6 direction.
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of the program MITSUBISHI A0J2R25.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.
3C-2V/5C-2V coaxial cable.
Double loop.
Remote station.
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program MITSUBISHI A0J2R25.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wwrong operation of the system A0J2R25.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..