LK Automation Limited LK Automation Limited
Download Sort: OMRON | MITSUBISHI | Proface | Mennekes | Yaskawa
Home >> Manual Download
OMRON K3HB-XVD-CPAC21 Communications Manual PDF
Product model: K3HB-XVD-CPAC21
Name: Digital Temperature Controllers
Brand: OMRON
Sort: Communications Manual
File language: English
Rated input (See note 2.): 3-phase 3-wire mode, 3-phase 4-wire mode;
AC 380, 400, 415, 480, AC 220, 230, 240, 277.
Ideal for 3-phase voltage asymmetry K3HB-XVD-CPAC21 PDF.
monitoring for industrial facilities and equipment.
Monitor voltage asymmetry, phase sequence, and phase loss,
for three-phase 3-wire or 4-wire power supplies with just one Unit.
Switch setting for 3-phase 3-wire or 3-phase 4-wire power supply K3HB-XVD-CPAC21
One SPDT output relay, 6 A at 250 VAC (resistive load).
World-wide power specifications supported by one Unit (switchable).
Relay status can be monitored using LED indicator. Setting range: 0.1 to 1 A AC/DC, 0 K3HB-XVD-CPAC21 PDF. 5 to 5 A AC/DC, 0.8 to 8 A AC/DC.
Power supply voltage: 24 VAC/DC.
Ideal for Current Monitoring for.
Industrial Facilities and Equipment.
Monitor for overcurrents or undercurrents.
Use commercially availlable CTs (CT current on secondary,
side: 0 to 1 A or 0 to 5 A) K3HB-XVD-CPAC21 Manual.
Manual resetting and automatically resetting supported by one Relay K3HB-XVD-CPAC21 PDF.
Startup lock and operating time can be set separately.
One SPDT output relay, 5 A at 250 VAC (resistive load).
Output relay can be switched between normally open and normally closed.
Output status can be monitored using LED indicator OMRON Communications Manual.
Inputs are isolated from the power supply. Time specification: Instantaneous type.
Current setting range: 8 to 26 A.
Operating voltage: 400/440 VAC.
Resetting method: Automatic (See note.).
Solid-state Relay Enables Choice of Three.
Operating Functions (Overcurrent, Open,
phase, and Reverse-phase) OMRON Communications Manual.
Protects 3-phase induction motors and their loads from damage.
Selection and combination of operating functions from overcur,
rent, open-phase, and reverse-phase.
Circuit and output relay operation can be checked by just operat,
ing the test button.
The set time value can be checked easily because operation time,
is indicated from the start of operation OMRRON Communications Manual K3HB-XVD-CPAC21 Communications Manual.
Space-saving, integrated construction.
Note: If the K2CM is used with an inverter, the operating conditions will,
depend on the load wiring length, inverter carrier frequency, basic,
frequency, and load conditions K3HB-XVD-CPAC21 Manual. Error will occur in the operating,
values of the overload elements. It is recommended to test operation,
before using the K2CM.
Related products