LK Automation Limited LK Automation Limited
Download Sort: OMRON | MITSUBISHI | Proface | Mennekes | Yaskawa
Home >> Catalog Download
MITSUBISHI AJ72P25 datasheet PDF
Product model: AJ72P25
Name: Network module
Brand: MITSUBISHI
Sort: PDF datasheet
File language: English
Series Name: A951GOT.
Size: 6 inches.
Resolution: 320 * 240.
Display device: STN monochrome display.
Display color: monochrome (white and black).
Power supply: DC24V.
Built in BUS Q communication interface.
Memory card: 3M.
China is the world''s biggest market for human machine interface,
But it is not the highest sales market in the world,
This shows that the low-end user interface in China has a large share of AJ72P25 PDF AJ72P25
In recent years, the rapid development of national brands, to take a low price and other strategies, is a massive attack on the low end of the market,
Has occupied the dominant position in the low-end market, has won the recognition of the majority of users.
International brands are also gradually developing its economic products, in order to seize the share of the low-end market AJ72P25 PDF.
Therefore, in the low-end market steady,
The overall performance of the domestic human machine interface manufacturers showing a rapid growth of the state. 10BASE-T
MITSUBISHI PLC is the main product in the production of MITSUBISHI motor in Dalian.
It uses a kind of programmable memory for its internal storage procedures,
Execute logic operation, sequence control, timing, counting and arithmetic operations, user oriented instruction,
And through digital or analog input / output control of various types of machinery or production process AJ72P25 PDF.
When the programmer input programinto the user program memory,
Then CPU according to the function of the system (the system program memory to explain the compiler),
Translate the user program into PLC internally recognized by the user to compile the program. 5 slots.
No need to install power.
For QnA/A series.
Switch volume control is designed to,
According to the current input combination of the switch quantity and the history of the input sequence,
So that PLC generates the corresponding switching output,
In order to make the system work in a certain order.
So, sometimes also known as the order control.
And sequential control is divided into manual, semi-automatic or automatic.
And the control principle is decentralized, centralized and hybrid control three.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mmode AJ72P25 datasheet.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program tto do the compiler to compile the process of interpretation AJ72P25 datasheet.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.
Related products