LK Automation Limited LK Automation Limited
Download Sort: OMRON | MITSUBISHI | Proface | Mennekes | Yaskawa
Home >> Catalog Download
MITSUBISHI A1SD75P3 datasheet PDF
Product model: A1SD75P3
Name: Positioning module
Brand: MITSUBISHI
Sort: PDF datasheet
File language: English
Series Name: A975GOT.
Size: 10 inches.
Resolution: 600 * 480.
Display device: D-STN color display.
Display color: 8 color.
Power supply: AC100-240V.
Memory card: 1M.
Man machine interface is the interface between man and machine in the field of information exchange and function contact or influence,
Information exchange, functional contact or mutual influence, the hard contact and soft touch of a person and machine,
This interface includes not only the direct contact point line side,
It also includes the function of remote information transmission and control A1SD75P3 PDF A1SD75P3
The man-machine interface is the central link in the man-machine system,
Mainly from the safety engineering branch of the safety ergonomics to study and put forward the basis for the solution,
And over the safety engineering equipment engineering, safety management engineering and safety systems engineering to study the specific solutions and measures to the safety of human computer science and technology A1SD75P3 PDF.
It realizes the transformation between the internal form of information and the acceptable form of human being. Enter 32 points A1SD75P3 PDF.
2/5mA DC12/24V.
Response time: 10ms.
32 point 1 public.
Output 32 points.
DC12/24V.
Leakage current: 0.1mA OFF.
Response time: 1ms.
32 point 1 public.
Protection function.
Surge.
40 pin connector.
Switching value, also known as logic, refers to only two values, 0 or 1, ON or OFF.
It is the most common control, it is the advantage of PLC control,
Is also the most basic application of PLC.
Switch volume control is designed to,
According to the current input combination of the switch quantity and the history of the input sequence,
So that PLC generates the corresponding switching output,
In order to make the system work in a certain order.
So, sometimes also known as the order control.
And sequential control is divided into manual, semi-automatic or automatic.
And the control principle is decentralized, centralized and hybrid control three. 3C-2V/5C-2V coaxial cable.
Double loop.
Remote station.
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system.
MITSUBISHI PLC initialization procedure. A1SD75P3 datasheet. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program arre: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc A1SD75P3 datasheet. .
Related products
MITSUBISHI
Positioning control module
A1SD75P1-S3
MITSUBISHI Positioning control module A1SD75P1-S3
Axis of control: 1. A1SD75 series compon
MITSUBISHI
Positioning control module
A1SD75M2
MITSUBISHI Positioning control module A1SD75M2
Axis of control: 2. Interpolation functi
MITSUBISHI
Positioning module
A1SD71-S7
MITSUBISHI Positioning module A1SD71-S7
2 axes. 2 axis linear interpolation. Con