LK Automation Limited LK Automation Limited
Download Sort: OMRON | MITSUBISHI | Proface | Mennekes | Yaskawa
Home >> Manual Download
MITSUBISHI A970GOT-TBD User's Manual (SW4D5C-GOTR-PACKE compatible Connection System Manual) PDF
Product model: A970GOT-TBD
Name: touch screen
Brand: MITSUBISHI
Sort: SW4D5C-GOTR-PACKE compatible Connection System Manual User's Manual
File language: English
DC input points: 16 points.
Input voltage and current: 3/7mA, DC12/24V.
Response time: 10ms.
Positive pole sharing.
16 point /1 a public side.
Output points: 12 points A970GOT-TBD PDF.
Output voltage and current: DC12/24V, 0.5A/1 point, 3.2A/1 common end.
Response time: 2ms.
8 point /1 a public end, 4 point /1 a public end.
Output form: transistor output, leakage type.
36 point terminal station.
Number of stations: 4 stops A970GOT-TBD
Compact remote I/O unit.
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system A970GOT-TBD PDF.
MITSUBISHI PLC detection, fault diagnosis and display and other procedures.
These procedures are relatively independent, generally in the basic completion of the program design and then add A970GOT-TBD PDF.
Hardware simulation method is to use a number of hardware equipment to simulate the generation of the signal,
The signals are connected to the input end of the PLC system in a hard wireed way, and the timeliness is strong A970GOT-TBD Manual.
Software simulation method is in the MITSUBISHI PLC in the preparation of a set of simulation program,
The simulation provides the field signal, which is simple and easy to operate, but it is not easy to guarantee the timeliness MITSUBISHI User's Manual.
Simulation of the process of debugging, debugging method can be used to segment, and the monitoring function of programmer MITSUBISHI User's Manual. Input and output points: 1024 points.
Input / output data points: 1024 points.
Program capacity: 14K.
Basic command processing speed (LD command) s:1.0.
AnNCPU command processing time and ACPU compare to 10-20% high speed processing.
User program storage capacity: it is a measure of how much the user application can store the number of indicators MITSUBISHI User's Manual.
Usually in words or K words as units. 16 bit binary number is a word,
Every 1024 words are 1K words. PLC to store instructions and data in words.
General logical operation instructions each account for 1 words. Timer / counter,
Shift instruction accounted for 2 words. Data operation instructions for 22~4 A970GOT-TBD User's Manual.
Integral type: the PLC components are installed together or a few pieces of printed circuit board,
And together with the power supply installed in the casing to form a single overall called the host or the basic unit, small, ultra small PLC using this structure A970GOT-TBD Manual.
Modular: PLC is the basic components of a separate module.
Medium and large PLC used this way. Easy maintenance.
Related products