Cable length: 20 meters.
For QCPU and GOT (need A9GT-QCNB) connection.
For the connection between GOT and GOT. Description: can form up to 8 of the star wiring, as well as the maximum length of the application of the transmission line distribution, waterproof (IP67) structure A970GOT-SBA PDF.
Spare 5 products for different purposes.
Thin waterproof type relay hub.
Extension of star type wiring and main line length, waterproof structure
A970GOT-SBA
Spring clip terminal type relay hub.
Star type wiring, length of the main line, spring clamping terminal table type.
Relay appliance (T branch) unit.
Extension of T type branch and trunk length A970GOT-SBA PDF.
Relay unit in light.
In the presence of interference in the environment of the wiring, the length of the trunk line.
Relay unit in space light.
Communication between linear moving bodies. Series Name: A951GOT.
Size: 6 inches.
Resolution: 320 * 240.
Display device: STN color display A970GOT-SBA PDF.
Display color: 8 color.
Power supply: DC24V.
Built in BUS Q communication interface.
Memory card: 3M.
China is the world''s biggest market for human machine interface,
But it is not the highest sales market in the world,
This shows that the low-end user interface in China has a large share of MITSUBISHI User's Manual.
In recent years, the rapid development of national brands, to take a low price and other strategies, is a massive attack on the low end of the market,
Has occupied the dominant position in the low-end market, has won the recognition of the majority of users.
International brands are also gradually developing its economic products, in order to seize the share of the low-end market MITSUBISHI User's Manual.
Therefore, in the low-end market steady,
The overall performance of the domestic human machine interface manufacturers showing a rapid growth of the state. For A6TBXE/A6TBY36E/A6TBX54E/A6TBY54E/A6TBX70E (common cathode; source) long 3m MITSUBISHI User's Manual. Input points: 32 points.
Voltage: AC200 ~ 240V.
Current: 12mA.
Response time: 25ms.
32 points / a common end.
38 point terminal station.
CE certification.
System program memory for storing system program,
Including management procedures, monitooring procedures, as well as the user program to do the compiler to compile the process of interpretation A970GOT-SBA Manual.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference. Therefore PLC selection,
Under the premise of meeting the control requirements,
Should consider the best performance to price ratio, a reasonable choice of PLC.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the compponent image register are changed with the change of the execution of the program A970GOT-SBA User's Manual.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to thhe adoption of centralized sampling A970GOT-SBA Manual.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.