LK Automation Limited LK Automation Limited
Download Sort: OMRON | MITSUBISHI | Proface | Mennekes | Yaskawa
Home >> Manual Download
MITSUBISHI A953GOT-SBD-B Operating Manual (Extended/Option Functions Manual) PDF
Product model: A953GOT-SBD-B
Name: touch screen
Brand: MITSUBISHI
Sort: Extended/Option Functions Manual Operating Manual
File language: English
CPU-A8UPU/A8PUJ connection.CPU connection program input device.
ACPU use. Output points: 16 points.
Voltage: DC24V/AC240V, 2A/1 point, 16A/1 public end A953GOT-SBD-B PDF.
OFF leakage current: 0.1mA.
Output type: relay output.
Response time: 12ms.
8 point /1 a public side.
20 point terminal station.
With the surge absorber.
The number of I/O thyristor DC motor control required tube DC motor speed control system is the main form of DC speed regulation,
The thyristor rectifier unit is used to supply power to the DC motor A953GOT-SBD-B
PLC control of the DC drive system, the input of the PLC in addition to the main signal outside the signal,
We need to consider the switching signal, the fault signal transmission device, brake signal and fan fault signal A953GOT-SBD-B PDF.
The output of the PLC mainly consider the speed command signal positive 1~3 level, 1~3 level, allowing reverse switching signal and brake open signal etc..
In general, a reversible DC drive system controlled by PLC is approximately 12 input points and 8 output points,
An irreversible DC drive system requires 9 inputs and 6 output points A953GOT-SBD-B PDF.
MITSUBISHI PLC is the main product in the production of MITSUBISHI motor in Dalian.
It uses a kind of programmable memory for its internal storage procedures,
Execute logic operation, sequence control, timing, counting and arithmetic operations, user oriented instruction,
And through digital or analog input / output control of various types of machinery or production process MITSUBISHI Operating Manual.
Control solenoid valve required I/O points by the action principle of the solenoid valve can be known,
A single coil solenoid valve with PLC control to 2 input and 1 output,
A double coil solenoid valve requires 3 inputs and 2 outputs,
A button needs an input; a light sensitive switch needs 4 or 2 inputs,
A signal lamp needs 1 output, band switch,
SSeveral bands are required for several inputs,
In general, a variety of position switches are required to take up 2 input points MITSUBISHI Operating Manual MITSUBISHI Operating Manual A953GOT-SBD-B Manual. RS-232 1 channel.
RS-422/485 1 channel.
Transmission speed: 2 channels.
At the same time the use of 115.2kbps may.
When the programmer input programinto the user program memory,
Then CPU according to the function of the system (the system program memory to explain the compiler),
Translate the user program into PLC internally recognized by the user to compile the program.
Input status and input information input from the input interface,
CPU will be stored in the working data memory or in the input image register.
And then combine the data and the program with CPU.
The result is stored in the output image register or the working data memory,
And then output to the output interface, control the external drive.
Semiconductor circuit with memory function.
System program memory and user memory.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program tto do the compiler to compile the process of interpretation A953GOT-SBD-B Operating Manual.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.
User memory: user program storage area and work data storage area.
Composed of random access memory (RAM) A953GOT-SBD-B Manual. User use.
Power cut off. Commonly used efficient lithium battery as a backup power supply, life is generally 3~5 years.